Description of works: Remove cast iron railings Strip bitmac of surface deck Scaffold to bridge over river Install new parapet railing system designed to match old railing Gunite under bridge deck Sand blast entire bridge structure Waterproof bridge deck and relay bitmac surface Paint entire bridge to match existing Stone masonry walls constructed to both […]

Description of works: Diversion and damming of watercourse Excavation of existing embankment Installation of reinforced concrete base Construction of 5m high reinforced concrete retaining wall Waterproofing of retaining wall structure Installation of new drainage Cladding of reinforced wall with cut masonry stone Construction of new cut masonry stone parapet wall Construction of new footpaths Construction […]

The wall, which is the only upstanding remnant of the Abbey’s medieval monastic foundation, was at risk of falling down following years of deterioration. In undertaking the restoration and stabilization work we were very conscious to cause minimum disruption and to retain as much of the existing wall as possible.  These challenges meant that work proceeded […]

Start Date Phase 1: December 2009 Completion Date: February 2010 Start Date Phase 2: November 2010 Completion Date: January 2011 Client: Waterways Ireland Project Value Phase 1 & 2: €97,000.00 Description of works: Lifting span bridge over the Shannon to facilitate cruisers on Shannon Erne Waterway Cantilevered Scaffolding erected under bridge deck Removal of existing […]

Description of works: Carried out condition surveys of existing and surrounding buildings Removal and disposal of asbestos containing material Isolation and diversion of existing services Soft stripping of interior of the buildings Demolition of 4 storey reinforced concrete frame structure Disposal/Recycling of all materials off-site Erection of 3.00m high palisade fencing and gates to secure […]

Description of works: Diversion and damming watercourse Demolition of existing bridge Installation of reinforced concrete base Installation of precast concrete box culvert Installation of new drainage system Construction of new masonry parapet walls Construction of new footpaths Road realignment and resurfacing Installation of rock armour to embankments Fencing and landscaping works

Description of works: Demolition of existing RC structures Propping and underpinning of listed masonry railway walls Conservation masonry repairs and repointing Excavation, drainage and service works Construction of new 320m RC retaining and support wall

Project Description: Internal Demolitions & strip out of existing anchor unit over 5 levels. Start Date: April 2010 Completion Date: July 2010 Client: Jervis Shopping Centre Tender Value: €600,000.00 Out Turn Cost: €700,000.00 Description of works: Internal Demolitions including strip out of all existing services, partition walls, floor finished and ceiling finishes. Demolition of internal […]

Description of works: design of spandrel arch steel footbridge site clearance and bulk excavation installation of water diversion and dam system design and installation of piling platform installation of pre-cast driven pile foundations construction of reinforced concrete bridge support thrust blocks and abutments installation of sheet pile flood defence wall incorporating concrete capping beam installation […]

Description of works: Construction of a new haul road to the North Circular Road and associated works on the St Brendan’s campus in Grangegorman, including surfacing, street lighting, installation of services and road markings Condition surveys to neighbouring properties adjoining to the site Carry out asbestos surveys to all buildings Associated works to services including […]

Phase 1 Start Date: September 2008 Phase 1 Completion Date: December 2008 Phase 1 Value: £136,000.00 Phase 2 Start Date: February 2009 Phase 2 Completion Date: June 2009 Phase 2 Value: £165,000.00 Description of works: Existing 47 arch span bridge Form cofferdam to divert water Power clean arch soffit Fix steel dowels and 3 layers […]

Description of works: removal of vegetation to quay wells repairs and repointing to quay walls with hydraulic lime mortar installation of reinforced concrete foundation base to end of quay installation of rock armour nosing protection to end of quay installation of precast edge beams to perimeter of quay installation of new reinforced concrete deck slab […]

Description of works: Grade B listed structure with works carried out under NIEA supervision Tree felling and removal of vegetation Site clearance and bulk excavation Exhumation carried out in adjoining 17th century graveyard under supervision of archaeologists Diversion of watercourse using sandbag dams, pre-cast concrete pipe systems and cofferdams Disposal of contaminated material from graveyard […]

Description of works: Removal of asbestos materials to all dwellings Internal strip out of all existing services, partition walls, floor finishes and ceiling finishes Demolition of 80 no 3 bedroom dwellings and 2 no apartment blocks using the latest construction techniques Removal of waste off site to relevant disposal/recycling facilities Construction of RC/block work walls […]

Project Name: Carlton House Location: Maynooth, Co Kildare Project Description: Demolition and Conservation Repairs to Listed Building Tender Value: £1.05M Out Turn Cost: £1.2M Detailed Description of the Project: In 1739 the 19th Earl of Kildare employed Richard Castles to build the existing house currently a Grade A Listed Heritage Structure. During 2005 McCallan Bros […]

Description of works: Works involved the refurbishment of a three span steel/concrete bridge Scaffold erect under entire bridge deck and to parapets to allow access to the works. The scaffold was completely enclosed to avoid contact with the public whilst the work was being carried out. Dry abrasive/repair blasting of all exposed steelwork Strengthening/repair to […]