Irishtown Road Footbridge, Omagh (Design & Build Contract)

  • Start Date:
    February 2012
  • Completion Date:
    April 2012
  • Client:
    DRD Road Service
  • Project Value:

Description of works:

  • design of spandrel arch steel footbridge
  • site clearance and bulk excavation
  • installation of water diversion and dam system
  • design and installation of piling platform
  • installation of pre-cast driven pile foundations
  • construction of reinforced concrete bridge support thrust blocks and abutments
  • installation of sheet pile flood defence wall incorporating concrete capping beam
  • installation of drainage
  • installation of service ducting
  • embankment construction and landscaping
  • fabrication and installation of 57 metre long steel structure with hi-spec protective paint system and bespoke stainless steel handrails
  • waterproof bridge deck and lay anti-skid surfacing
  • construction of approach foot/cycle paths to tie into existing
  • erection of mesh grid fencing to neighbouring boundaries
© Copyright - McCallan Bros. Ltd